45m long bridge over the river, composed of two prefabricated coffer beams 45m long and 2,20m high, pre-stressed, the board being made of a concrete slab “in situ” over pre-lages in width of 11,50m. The meetings are formed by support walls concreted “in situ”. Guarded by bodyguards on sidewalks protected by security guards.