Bridge Over the river Bugio and section of the river to EN206
Fafe

45m long bridge over the river, composed of two prefabricated coffer beams 45m long and 2,20m high, pre-stressed, the board being made of a concrete slab “in situ” over pre-lages in width of 11,50m. The meetings are formed by support walls concreted “in situ”. Guarded by bodyguards on sidewalks protected by security guards.

back